1 Location
2 Crossings
3 Stations
4 Estimate
Plan
Profile
Curves
Features
Crossings
Stations
Structures
Estimate
Intersection points
+ IP
Delete
Drag any point in the plan view to move it. A next to cant or transition
means the value is set automatically from the radius and design speed — clear the box to
re-enable it, or type a value to fix it by hand.
Vertical intersection points
+ VIP
Delete
Give either a curve length L or a radius Rv — whichever you
leave blank is derived from the other.
Existing ground
Paste or load chainage, level rows to show the ground line and
cut/fill in the profile.
Apply
Load CSV…
Clear
Horizontal curve schedule
Vertical curves
Before crossings can be worked out
Roads, other railways and watercourses are found by looking up the
real world around the alignment, then comparing rail level against the ground at
each intersection. That needs the following first.
Continue anyway
Corridor features
Roads, railways and watercourses within the corridor, from
OpenStreetMap. Coverage of minor roads and field drains is patchy in places, so
treat this as a first pass rather than a survey.
Look up the corridor
electrified
Crossing schedule
Each place the alignment meets something, and what it takes to get
past. The engine proposes a type; anything you change by hand is kept and
re-applied when the schedule is recomputed.
Group
Size waterways
≈ Hydrology
Dickens C
11–14 plains · 14–19 central · 22+ ghats
Abstract of cost
⤢ Expand
Unit rates…
Export CSV
Priced on the Indian Railway plan heads. Quantities are read from the
design — earthwork from the structures pass, bridges from the crossing schedule,
loops and platforms from the station schedule — so the estimate cannot drift from
the drawing. The rates are indicative round figures, not a schedule of rates.
Set them to the rates of your division and year before the total means anything.
Plan head
Stations & Yard Layouts
+ Station
Auto-suggest
Justification
Station CSBs (Centre of Station Building) placed near habitable areas, with a
halt inserted wherever the block section would otherwise run long. The thresholds this
works to — block section length, loop CSL, who is worth a station — are the ones set on
the Inclusion and Stations tabs of the Considerations panel, so this panel
does not restate them and cannot fall out of step with them.
Station Schedule